LOS ANGELES UNIFIED SCHOOL DISTRICT Draft ENVIRONMENTAL IMPACT REPORT  for the Valley New High School No. 1

Lead Agency:
Los Angeles Unified School District Environmental Health and Safety Branch 355 S. Grand Avenue, 6th Floor
Los Angeles, California 90017 (213) 633-8810

Prepared by: Aspen Environmental Group 30423 Canwood Street, Suite 215 Agoura Hills, California
October 2001 

1. EXECUTIVE SUMMARY
2. PROJECT DESCRIPTION
3. ENVIRONMENTAL ANALYSIS
3A. AIR QUALITY
3B. GEOLOGY & SOILS
3C. HAZARDS AND HAZARDOUS MATERIALS
3D. HYDROLOGY & WATER QUALITY
3E. LAND USE
3F. NOISE
3G. PUBLIC SERVICES AND UTILITIES
3H. TRANSPORTATION/ TRAFFIC 
4. ALTERNATIVES ANALYSIS
5. OTHER CEQA CONSIDERATIONS
6. REFERENCES
7. REPORT PREPARATION
8. ACRONYMS AND ABBREVIATIONS
APPENDICES
A. Notice of Preparation, Initial Study, and Comments on Initial Study
B. Cultural Resource Evaluation
C. Air Quality Modeling
D. Hazards and Hazardous Materials Correspondence
E. Public Utilities and Services Letters
F. Traffic Analysis

Revised Traffic Analysis

LIST OF TABLES
ES-1 Summary of Impacts and Mitigation for the Valley New High School No. 1 ... 
2-1 Existing Schools and Enrollment for Schools Within the Valley Planning Area .. 
2-2 Construction Equipment ..... 
2-3 Proposed On-Site Facilities ....
2-4 LAUSD Master Plan Schools .....
2-5 Cumulative Projects ....
3A-1 Monthly Average Temperatures and Precipitation.... 
3A-2 National and California Ambient Air Quality Standards... 
3A-3 Summary of Health Effects of the Major Criteria Pollutants.... 
3A-4 Attainment Status of South Coast Air Basin .....
3A-5 Project Area Air Quality Summary ......
3A-6 SCAQMD's Thresholds of Significance for Proposed Project..
3A-7 Estimated Maximum Daily Construction Emissions...
3A-8 Rule 403 Measures for High Wind Conditions... 
3A-9 Rule 403 Measures for Normal Wind Conditions .. 
3A-10 Total Daily Operational Emissions.....
3A-11 Estimated Future Maximum CO Concentrations....
3B-1 Characterization of Faults Considered Significant Seismic Sources to the Site . 
3C-1 Organochlorine Pesticide Concentrations ...
3C-2 SVOC Concentrations..... 
3C-3 PAH Concentrations ... 
3C-4 Title 22 Metals Concentrations ...
3C-5 Summary Results: Soil Sample Locations Containing Pesticide Concentrations that Exceed DTSC Screening Criteria ...
3C-6 Identified COPCs for the Proposed Site..... 
3C-7 Summary of Estimated Risks and Hazards.....
3D-1 Summary of Water Supply, Oprations, and Hydrologic Conditions of the ULARA .
3F-1 Ambient Measured Noise Levels of the Project Area .... 
3F-2 Summary of Traffic Noise Modeling for Existing Conditions ... 
3F-3 Summary of Noise Levels Identified as Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety .... 
3F-4 Land Use Compatibility for Community Noise Environment....
3F-5 City of Los Angeles Guidelines for Noise Compatible Land Use ..
3F-6 Acceptable Operational Vehicular Noise Levels Established by LAUSD .. 
3F-7 Typical Sound Levels Measured in the Environment and Industry.... 
3F-8 Noise Emission Characteristics of Construction Equipment .. 
3F-9 Comparison of Noise Modeling Results..... 
3G-1 Existing Fire Stations Available for Initial Response.....
3G-2 Current Enrollment and Existing Classroom Capacities for Nearby Schools.... 
3G-3 Landfills that May Serve the Proposed Project Site ... 
3G-4 Estimated Wastewater Discharges with the Proposed School
3H-1 Intersection Level of Service Definitions
3H-2 Existing Levels of Service – AM Peak Hour
3H-3 Future Levels of Service -AM Peak Hour
3H-4 Project Trip Generation Summary
3H-5 Future with Project Level of Service Summary
3H-6 Future with Project Mitigation
3H-7 Summary of Parking Requirements .
3H-8 Cumulative Project Trip Generation Summary
4-1 Comparison of Alternatives to the Proposed Project .

LIST OF FIGURES
1-1 The EIR Process 
2-1 Regional Location and Local Vicinity of the Project
2-2 Aerial Photo
2-3 Schools Above Peak Capacity
2-4 Construction Schedule and Phasing 
2-5 Site Plan
2-6 Exterior Elevations
2-7 LAUSD Concept 6 Schedule Year-Round Instructional School Calendar
2-8 New Schools Needed in the Valley Planning Area
2-9 Location of Cumulative Projects
3A-1 South Coast Air Basin 
3B-1 Regional Faults and Seismicity Map
3E-1 Land Use Design
3E-2 Land Uses in the Project Area
3F-1 Noise Monitoring Locations
3H-1 Study Intersection Locations
3H-2 Existing AM Peak Hour Traffic Volumes
3H-3 Existing Intersection Lane Configuration
3H-4 Future No Project AM Peak Hour Traffic Volumes
3H-5 Project Trip Distribution Pattern
3H-6 Project Only AM Peak Hour Intersection Traffic Volumes
3H-7 Future with Project AM Peak Hour Traffic Volumes
4-1 Project Location and Alternative Sites
4-2 New Schools Needed in the Valley Planning Area